Modeling of Sediment Transport in Bothnian Bay in the Vicinity of the Nuclear Power Plant ‘Hanhikivi-1’ Construction Site
The intensity of sediment resuspension and sedimentation in the eastern part of the Bothnian Bay near the Hanhikivi cape, where the nuclear power plant ‘Hanhikivi-1’ will be constructed, has been assessed for the first time by means of numerical modeling under the realistic external forcing that occurred in 2014. A brief description of a coupled modeling system used in the study is given. The results of local resuspension intensity and sediment accumulation rates for one-year model run are presented. It has been determined that the main areas of sediment accumulation are located along the northern coast off the Hanhikivi peninsula and in the shallow region situated to the north-east off the cape. Sedimentation rates in the navigation channel have also been estimated. Model results obtained for 2014 suggest that sedimentation in the seaward part of the channel is absent, while sediment accumulation intensity is about 10 cm/year in the middle part of the channel and 70 cm/year in the coastal part. A temporal variability of the sedimentation rates during the year has been emphasized.